- 01 Description
- 02 Site plan
Description
The BTS facility for the fashion chain H&M was the first project in the developer's portfolio to feature environment- friendly solutions on a wide scale.
Solar panels are installed on the roof, and used to heat water; the modern structure used in the warehouse hall lets in daylight, Which makes for daytime energy savings. The building is equipped with a rainwater harvesting system, and materials such as PVC or polystyrene foam were not used in the construction.
0 m2
available space
0 m2
total planned area
0 m2
existing area
Site plan

Download further information


Contact us
We would love to hear from you. Send us an email using the form below or give us a call.
Thank you!
We will get back to you as soon as possible.
