Planned

Panattoni Park Ennshafen

DGNB_Wavequad_Gold

The sustainable business park with an area of over 40,000 m² in Upper Austria is located in the Ennshafen industrial estate and connects 
the main transport routes for international goods traffic. 

Completion is planned for Q2 2025.

DGNB_Wavequad_Gold
FF13947_2023-10-13_200_CGI
FF13947_2023-10-09_cam2 (1)
FF13947_2023-10-13_192_CGI

Description

High

Sustainability standards

24/7

Operation permit

Trimodal connection

Road, rail & water

Panattoni Park Ennshafen is being built on a site area of 65,000 m². The property is located in the economically strong region of Upper Austria between Linz and Vienna in the Ennshafen industrial estate. The site has excellent trimodal connections to the European economic centers thanks to its connection to inland shipping via the Rhine-Main-Danube waterway and to the rail network via a container terminal as well as the nearby B1 federal highway and the A1 west freeway.

On completion, the new building will have a gross floor area of around 42,000 m², of which approx. 35,000 m² will be hall space, 3,000 m² office space and 3,000 m² mezzanine space. The height of the building is 10.50 m UKB. More than 100 vehicle parking spaces are planned for the outdoor areas. The flexible usage concept with variably divisible rental units of 3,000 m² or more is ideal for small and medium-sized enterprises (SMEs) and industrial use. Due to its proximity to Linz (and to Voestalpine), the location is ideal for users from the metal and steel processing, food, automotive, chemical and transportation sectors.

Panattoni is aiming for DGNB Gold Standard certification for the project development and is implementing extensive sustainability measures, including the installation of a photovoltaic system on the roof of the property and the greening of the outdoor areas. In addition, the use of district heating or a heat pump is planned for the energy supply. There are also plans to install bicycle shelters, e-charging points and a mobility concept with a cycle path and bus connections

Green building - sustainable aspects

  • DGNB Gold certification
  • Photovoltaic system
  • Greening of the remaining roof area (without photovoltaic system)
  • Natural design in the outdoor area
  • Fossil-free district heating
  • Creation of an e-charging infrastructure for electric vehicles
  • Smart metering

 

Click here for the press release.

35 000 m2

Warehouse space

3 000 m2

Office space

2 800 m2

Mezzanine space

Building details

Buildings Warehouse space Total building area Height Column grid Min. module
Hall 1 16 250 m2 19 250 m2 10,50 24 m x12 m 3 000 m2
Hall 2 19 250 m2 22 250 m2 10,50 24 m x12 m 5 500 m2
Hall 1
Total building area 19 250 m2
Min. module 3 000 m2
Height 10,50
Column grid 24 m x12 m
Warehouse space 16 250 m2
Hall 2
Total building area 22 250 m2
Min. module 5 500 m2
Height 10,50
Column grid 24 m x12 m
Warehouse space 19 250 m2

Site plan

Lageplan Ennshafen 2
10,5 m

Clear internal height

6t / m²

Floor bearing capacity

Photovoltaics

LED lighting

Gold

DGNB

2.997 m²

Min. module

100

Car parking spaces

EV charging point

2

Number of buildings

7

Flexible modules

65.000 m²

Total plot size

FM Global

Sprinkler system

Teils begrünte Dächer

Biodiversity

Fernwärme

Heating

7

Level access gate

23

Docks trucks

DIN 18202

Floor levelness

Bicycle spaces

24 x 12 m

Column grid

Distances

0,3 km

B1

6 km

A1

29 km

Airport Linz

1 km

Port Ennshafen

20 km

Linz

1 km

Container terminal

Sustainability

In the development of our Panattoni parks, we attach equal importance to sustainability in addition to third-party usability. We strive for an optimized eco-balance with a low CO2 footprint.

Further background information

Click here to download more detailed information about our properties.

Exposé Panattoni Park Ennshafen Download