BTS Neuca

Description

WITH A LARGE NUMBER OF RECEMNG DOCKS FOR SMALLER VEHICLESP NEUCA IS ABLE TO PROVIDE A SUPERIOR SERVICE TO PHARMACIES AND TRANSFER MEDICAL PRODUCTS FASTER.

The BTS facilities for Neuca meet the strictest requirements applicable to the Logistics of pharmaceutical products. The facilities feature non- standard spacing of main structural axes, custom- tailored to the planned sorter technology. The warehouse in Ożarów has two building heights, 13 m and 10 m - in the higher section products are stored in pallets, while the lower section is used e.g. to storę goods on fiat racks. Due to the choice of Solutions applied in the higher section and characteristics of the narrow-aisle forklift trucks working there, the warehouse flooring conforms not only with formal requirements, like being washable and dustproof, but most of all those relating to surface stability and superior flatness - the elevation difference must not exceed 1 mm at the distance of 2 metres along the track. Seen as controlled temperatures must be maintained forvarious pharmaceuticals, the walls in the facility have high insulation properties.

0 m2

available space

0 m2

total planned area

0 m2

existing area

Site plan

BTS Neucasite plan image

Download further information

contact-us3

Contact us

We would love to hear from you. Send us an email using the form below or give us a call.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Thank you!
We will get back to you as soon as possible.

More available property in this area