- 01 Description
- 02 Site plan
Description
THE BTS FACILITY FOR LEAR CORPORATION CAME INTO BEING THROUGH THE RECONSTRUCTION OF AN EXISTING FACILITY IN LEGNICA, AT THE LEGNICA SPECIAL ECONOMIC ZONĘ.
It was a brownfield investment, involving the adaptation of the facility and infrastructure to the needs of a new tenant, as a result of which a modern warehousing and manufacturing centre was built, and now employs 800 people. The investment features a series of Solutions dedicated to Lear’s specialized production process, including a side receiving dock, in-house paint shop and transformer stations.
0 m2
available space
30 500 m2
total planned area
0 m2
existing area
Site plan

Download further information


Contact us
We would love to hear from you. Send us an email using the form below or give us a call.
Thank you!
We will get back to you as soon as possible.
