BTS Lear

Description

THE BTS FACILITY FOR LEAR CORPORATION CAME INTO BEING THROUGH THE RECONSTRUCTION OF AN EXISTING FACILITY IN LEGNICA, AT THE LEGNICA SPECIAL ECONOMIC ZONĘ.

It was a brownfield investment, involving the adaptation of the facility and infrastructure to the needs of a new tenant, as a result of which a modern warehousing and manufacturing centre was built, and now employs 800 people. The investment features a series of Solutions dedicated to Lear’s specialized production process, including a side receiving dock, in-house paint shop and transformer stations.

0 m2

available space

30 500 m2

total planned area

0 m2

existing area

Site plan

BTS Learsite plan image

Download further information

contact-us3

Contact us

We would love to hear from you. Send us an email using the form below or give us a call.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Thank you!
We will get back to you as soon as possible.

More available property in this area