Under construction

BTS Kion Group

Panattoni Europe has completed a turn-key facility for the client Kion Group at Panattoni Park Stříbro close to exit 107, motorway D5, which forms a perfect connection between the Czech Republic and Germany.

BTS Kion Group
BTS Kion Group

Description

Panattoni Europe has completed a turn-key facility for the client Kion Group at Panattoni Park Stříbro close to exit 107, motorway D5, which forms a perfect connection between the Czech Republic and Germany. Construction of the second production plant within the territory of the Czech Republic was commenced on November last year. The total area of the production hall is 27 000 sqm with the possibility of future expansion up to 50 000 sqm in the same building. Kion Group has selected the Pilsen region for a number of reasons, namely, the client has an existing Linde plant in Aschaffenburg and Linde Pohony in Český Krumlov where it has been producing for over 16 years electrical and for the past four years hydrostatic drive axles for Kion Group.

0 m2

available space

0 m2

total planned area

0 m2

existing area

Site plan

Map location

BTS Kion Groupmap location image
contact-us3

Contact us

We would love to hear from you. Send us an email using the form below or give us a call.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Thank you!
We will get back to you as soon as possible.