BTS for BSH

The largest plant manufacturing household appliances in Europe – a dishwasher factory for BSH Sprzęt Gospodarstwa Domowego. The facility dedicated to Industry 4.0 has been built in Łódź within the Central European Logistics Hub.

Case
study

:

Łódź

:

BTS

:

170,200 sqm

:

3 BTS for BSH

57,000 sqm

factory

79,000 sqm

logistics center

34,200 sqm

appliance park

The BSH factory in Łódź has taken a place at the centre of the company’s logistics hub. By constructing two roofed and walled passageways, 58 metres long each, Panattoni Europe linked it up with the 79,000-square-metre BSH Logistics Centre. The latter, which has its own railway siding, finds itself at the Central European Logistics Hub – the largest logistics complex in Europe. The tunnels connecting it with the factory allow for an uninterrupted flow of materials between the facilities, and facilitate the logistics of finished products from the factory to their destinations. The HUB complex also includes a 30,000-square-metre Panattoni Appliance Park. It was developed exclusively for the needs of the BSH dishwasher factory. The park provides a base for manufacturers and subcontractors, whose transport operations are facilitated by the road to the BSH factory created by Panattoni.

The BSH dishwasher factory in Łódź gives jobs to over 1500 people, who makes 3 million appliances a year. The products made at the plant include slim-line 45 cm dishwashers, which were not manufactured in Poland to date, and also appliances featuring the Home Connect function – BSH’s own solution based on the Internet of Things. It provides for enhanced functionality of devices thanks to smartphone and tablet applications.

 

_DSC7771
_DSC7928
_DSC8006
_DSC7861
_DSC7717
In the construction, at the peak of the project, we engaged 400 workers & 50 contractors. Marek Dobrzycki

Marek Dobrzycki, Managing Director Panattoni, explains: “The development of the BSH factory was a complex process. Already the purchase of land was a major undertaking, as we acquired the site from 21 owners. In the construction, at the peak of the project, we engaged 400 workers and 50 contractors. It was our third joint project with BSH, but by far the most demanding. However, with enough elbow grease and excellent planning, we have managed to deliver on time”.

According to Konrad Pokutycki, CEO of BSH in Poland: “The building was designed with eco-friendly solutions in mind. The machine cooling system and climate control are highly energy-efficient. The plant will also use rainwater harvested using a special installation. Moreover, strategically placed skylights will let in natural sunlight, both into staff facilities and the manufacturing hall”. He concludes by saying “BSH places strong emphasis on being a pro-environmental business”.

Ball (5)
CASE STUDY

A former Škoda industrial site in Pilsen is now home to a new production facility for Ball Corporation. In this episode of #PanattoniTV, we look at what it takes to turn such a site into a fully operational plant.

PANATTONI BIDFOOD V1 CLEAN.00_04_29_20.Still016
CASE STUDY

Bidfood, an international food distributor serving the HoReCa sector, is growing its operations through a nationwide network of locations across Poland. We filmed the latest episode of Panattoni TV at Panattoni Park Szczecin V, where the company leases 8,600 sqm.

MSK-Panattoni_250920-Eroeffnung-BensheimII_GVOMEDIA-119
CASE STUDY

Panattoni is creating climate-neutral real estate solutions in Bensheim with GDP/GMP-certified space for pharmaceutical logistics company MSK Pharma Group.

Nexans_0542-small
CASE STUDY

From cable pioneer to high-tech innovator: At the new build-to-suit site, “Stella Nova”, at Panattoni Campus Hannover Zentrum, Nexans manufactures superconductive cable systems and cryogenic technology at a site steeped in tradition and with a view to a networked, electrified future.